DAMWANDDIRECT GENERAL TERMS AND CONDITIONS Version: 2026-08-18-v1 Date: 18 August 2026 Trader Houthandel Jan Sok B.V., trading as DamwandDirect Celsius 10, 7942 DB Meppel Chamber of Commerce (KvK) 04062841 VAT ID NL818404541B01 info@damwanddirect.nl 0522 851 551 1. Enquiry The public shopping cart and enquiry form submit a non-binding quote request. Receipt of that request does not constitute a purchase agreement, obligation to pay, stock reservation or promise of delivery. 2. Personal quote and formation of the contract After manual checking, DamwandDirect may provide a personal secure payment page. This shows the fixed quote lines, amounts, VAT, validity period, delivery or collection plan, payment options, return information and applicable document versions. The order is formed only when the customer expressly accepts the displayed quote and terms using the “Order with an obligation to pay” button and the server confirms that acceptance. The customer receives an email confirmation that can be saved. 3. Payment The online consumer flow offers voluntary full prepayment only. If the customer wishes to pay no more than 50 percent in advance, they must make contact before acceptance. Such an alternative requires a manually recorded agreement and is not automatically available online. Mollie processes the selected online payment. A redirect, payment link or pending status is not proof of payment. Only a status checked again with Mollie counts as paid. 4. Availability and delivery An enquiry, quote, order or payment does not automatically reserve stock or release delivery. Products, quantities, access, transport, internal acceptance and the delivery or collection plan are checked and confirmed separately. 5. Withdrawal period A consumer purchasing standard products online generally has a 14-day withdrawal period. For goods, this period starts on the day after receipt; for deliveries in parts, on the day after receipt of the last part. The consumer does not have to give a reason and may withdraw before delivery too. Withdrawal is possible without an account through https://damwanddirect.nl/en/withdrawal/, using the model withdrawal form or by another unambiguous statement to info@damwanddirect.nl. The online function immediately issues an acknowledgement with the server date, time, order and reference. 6. Returning goods and direct return costs The consumer sends or brings the goods back to Houthandel Jan Sok B.V., Celsius 10, 7942 DB Meppel no later than 14 days after withdrawal, unless DamwandDirect has agreed in writing to collect them. Large returns must be notified in advance to plan safe unloading. The consumer bears the direct return costs. For large materials that cannot normally be returned by post, the secure order page shows a manually estimated return transport amount before acceptance. DamwandDirect charges no return transport amount when the consumer brings the goods back; the consumer bears their own transport costs. 7. Reimbursement Following a valid full withdrawal, DamwandDirect reimburses the purchase amount received and the standard outbound delivery costs within 14 days, using the same payment method unless the consumer agrees to another method at no cost. DamwandDirect may wait until the goods have been received back or the consumer supplies evidence of return, whichever happens first. The consumer may be liable for diminished value resulting from handling beyond what is necessary to establish the nature, characteristics and functioning of the goods. 8. Exceptions A statutory exception, for example for a product genuinely made to personal specifications, applies only where permitted by law and clearly stated in the personal quote before acceptance. A standard size, selected quantity or opened transport package does not automatically remove the withdrawal period. 9. Statutory rights and complaints Statutory conformity rights remain applicable. A defect, transport damage or incorrect item can be reported with order details to info@damwanddirect.nl. DamwandDirect assesses which statutory remedy applies. A complaint can be submitted by email, telephone or letter and will receive a substantive response within a reasonable period. 10. Project responsibility Product selection and a quote do not replace structural design, strength calculations, soil investigation, cable and pipeline checks, permits or a safe working method. Only advice or installation agreed in writing forms part of the order. 11. Business customers and applicable law The statutory consumer right of withdrawal does not apply to a business purchase. Business invoicing or payment arrangements require separate approval. Dutch law applies without prejudice to mandatory consumer protection.