Understand your waterfront
How does Prolock work?
In Prolock Sigma, the plastic panels and longer support posts each have a different job. The panels retain the soil behind the revetment; the posts provide its structural support. Understanding that division helps you assess dimensions, components and a quotation.
One bank, different functions
This simplified side view shows the principle: water on the left, land on the right. The panel ends above the bottom of the support post. The numbers refer to the explanations below; positions and proportions are illustrative only.
- Plastic panel
Retains soil and forms the wall together with adjacent panels.
- Support post
Extends deeper than the panel; material and length follow from the design.
- Capping beam
Finishes the top edge; does not replace structurally designed support members.
- Water level
May fluctuate. Record the usual level and known low and high levels.
- Ground level
The land-side ground height, including any proposed filling.
- Waterbed
The bed in front of the wall; silt is not the same as a competent soil layer.
Keep these four measurements separate
- Water level
- The height of the water relative to a fixed reference point. The water surface is not a reliable fixed datum where levels fluctuate.
- Retained height
- The difference in soil levels the wall has to retain. This does not automatically equal the visible section above water. Record both ground and bed levels for assessment.
- Embedment
- The part of a post or panel below the relevant bed or ground level. Adequate embedment cannot be established from a photograph or water depth alone.
- Panel length
- The full vertical product dimension, including the portion that will be out of sight. Post length is a separate dimension; do not simply match it to the panel length.
Interlocks, finishing and structural support
Sigma panels slide into one another from above through their interlocks to create a continuous soil-retaining wall. The joint belongs to the system; on its own, it does not determine how much soil pressure or additional loading the complete revetment can carry.
A capping beam provides a neat top edge. Corner and connecting components form the transitions. Structural walings and any required anchoring have a different purpose: they transfer forces where the design requires them. Choose fasteners and finishing components to suit the supporting structure, rather than treating them as substitutes for it.
Sigma panels and componentsWhy water level matters for the posts too
The manufacturer describes a hybrid system in which the post section under water and in the ground contributes to its strength. That is not a blanket guarantee for every timber post or site. Fluctuating water levels, ground conditions, timber selection, loading and construction details remain important. A plastic panel therefore does not remove the need to assess the supporting structure.
This explanation focuses on Sigma for lighter bank revetment. Omega also uses the principle of panels with support posts, but serves a different application range. Nova has a different post-and-board arrangement.
Compare the Prolock systemsWhat you need to describe your project
Start with a sketch of the alignment and collect the details below. This makes clear which components can be discussed and which issues still need technical assessment.
- Total bank length, curves, corners and connections to existing structures.
- Ground level, bed level, water depth and known low and high water levels, all using the same fixed reference point.
- Soil information and photographs of both sides, including existing posts, damage and site access.
- Use behind the wall, such as a garden, path, storage or vehicles, and its distance from the bank.
Bank length alone allows you to count panels, but not to choose a safe post length or anchoring arrangement. Have the complete construction and any local consent requirements assessed before making the final material selection.
Turn understanding into a complete enquiry
Sources for this explanation
Manufacturer information supports the operating principle and system components. DamwandDirect created the explanation and diagram; they do not replace a project-specific calculation.