Product and operation
How does Prolock Sigma work?
See how plastic panels, supporting piles and capping work together. With a schematic and explanations of water level, retained height and component length.
Read the guideWhich revetment suits your bank, what is included in the costs and what should you check before installation or replacement? Find a practical step-by-step guide or go straight to the answer to your question, with links to the sources used.
Short answer
That depends on soil, water level, retained height, loading behind the bank, access and desired construction. A plastic panel, timber board or sheet-pile profile is only one component of the complete structure.
Choose your question
Choose the guide that fits your question: comparing materials, understanding costs or preparing installation. You will also find the relevant products and sources.
Product and operation
See how plastic panels, supporting piles and capping work together. With a schematic and explanations of water level, retained height and component length.
Read the guideRules at your waterfront
Steps for installation or replacement: location, water authority, Dutch Vergunningcheck, landowner consent and excavation preparation.
Read the guideMaintenance and renewal
Record the bank's condition and discuss repair, reuse or renewal. With a checklist for photos, components and your enquiry.
Read the guideSystem selection
What plastic revetment is, when Prolock Sigma is a sensible option to investigate and which project details determine the complete construction.
Read the guideMaterials comparison
Compare plastic panels, hardwood post-and-panel construction and continuous hardwood sheet piling by function and construction.
Read the guideCosts and quotes
A cost breakdown with a panel example: materials, structural supports, finishing, transport and project-specific items.
Read the guidePreparation
Which measurements, photos and environmental details are needed and when structural or permit checks should follow.
Read the guideDirect answer
Read the short answer and open the related guide for the full explanation. Each answer lists the sources used.
Revetment is the broad term for a structure protecting a bank or ground edge. Sheet piling forms a continuous earth-retaining wall; post-and-panel revetment and Prolock Sigma have different constructions. The required structure follows from the location and load, not material alone.
Content reviewed on .
Verification sources: Current range and product pages, Prolock Sigma: revetment for lighter water-retaining structures
Compare construction methodsThe published Sigma panels have a working width of 0.5 metres. One straight linear metre therefore starts with two panels. Corners, ends, height transitions, posts, connections and finishing must then be determined separately; two panels are not a complete materials list.
Content reviewed on .
Verification sources: Current range and product pages, Prolock Sigma: revetment for lighter water-retaining structures
View the Sigma constructionSigma construction combines plastic panels with project-specific supporting posts. Depending on the route, capping rail or caps, joining pieces, corner profiles and fixings are added. Post size, spacing, anchoring and quantities are not universal product properties and must be checked per project.
Content reviewed on .
Verification sources: Prolock Sigma: revetment for lighter water-retaining structures, Current range and product pages
View Sigma panels and componentsProlock Sigma combines a short plastic panel with longer supporting posts. Profextru describes softwood posts as the starting point and mentions hardwood posts or steel tubular piles where softwood is insufficient according to the strength assessment. Material, size, spacing and embedment depth must therefore be determined per project.
Content reviewed on .
Verification sources: Prolock Sigma: revetment for lighter water-retaining structures, How the hybrid Prolock system works
View Sigma construction and project limitsProfextru positions Sigma for lighter bank revetment with plastic panels and project-specific posts, Nova as plastic post-and-panel revetment for low water-retaining structures, and Omega as a sheet-piling system for heavier water-retaining structures. Soil, water level, retained height, surcharge and supporting structure determine which option to investigate; a system name alone is not a construction choice.
Content reviewed on .
Verification sources: Prolock Sigma: revetment for lighter water-retaining structures, Prolock Nova: plastic post-and-panel revetment, Prolock Omega: heavier sheet-pile constructions
Compare Sigma, Nova and OmegaNo. A cart and quote request do not allocate materials. Use the product page for current publication and price status; availability and transport are checked again in the order or quote route.
Content reviewed on .
Verification sources: Current range and product pages, Delivery and collection
Check the current rangeDo not compare panel or board prices alone. Supporting posts, walers, finishing, fixings, corners, anchoring, transport, access and installation also determine the total project cost. Without project details, a general price per metre is not reliable.
Content reviewed on .
Verification sources: Current range and product pages, Delivery and collection
View the complete cost breakdownRecord at least route length, desired and retained height, water level, known soil conditions, loading behind the bank, corners, height transitions and access. Photos and a clear site sketch make unresolved assumptions visible but do not replace structural assessment.
Content reviewed on .
Verification sources: Current range and product pages, Installing sheet piling
Complete the project detailsThis can vary by location and activity. Before ordering or installation, check the Dutch Vergunningcheck and rules of the municipality, water authority, province or Rijkswaterstaat. A product page cannot determine that location-specific outcome.
Content reviewed on .
Verification sources: Installing sheet piling, Dutch Vergunningcheck
Follow the permit and notification stepsFor machine excavation in the Netherlands, an excavation notification must be submitted before work to obtain current cable and pipeline information; according to Kadaster, excavation depth does not affect this. Notification is made at least 3 and no more than 20 working days before starting. A KLIC notification does not replace a permit check.
Content reviewed on .
Verification sources: KLIC notification for cable and pipeline information, Kadaster questions and answers for excavators, Dutch Vergunningcheck
View work preparationYou can survey the route and project details yourself, but installation is not automatically a DIY job. Profextru describes it as precise, complex work requiring experience and skill. Soil, retained height, load, access and local rules determine the appropriate professional or structural help.
Content reviewed on .
Verification sources: Installing plastic revetment, Installing sheet piling
View installation and project checksYes. IPLO states that landowner consent is required when work takes place on someone else's land. That consent does not replace the Vergunningcheck, notifications, water authority rules or other public-law obligations. DamwandDirect cannot establish property boundaries or consent on the parties' behalf.
Content reviewed on .
Verification sources: Installing sheet piling, Dutch Vergunningcheck
Check consent and local rulesThat cannot be determined from route length or panel size alone. Profextru states that anchoring can be added for additional strength depending on the strength calculation. Soil, retained height, water level, surcharge, post selection and access must therefore first be assessed as one project construction.
Content reviewed on .
Verification sources: Prolock Sigma: revetment for lighter water-retaining structures
See which Sigma details are needed firstAccording to Profextru, the Prolock Sigma system has a guaranteed service life of at least 60 years. The manufacturer bases structural strength on the timber under water and in the ground; timber above the waterline can rot over time. This is a manufacturer statement about the system, not an automatic DamwandDirect guarantee for every project construction.
Content reviewed on .
Verification sources: Prolock Sigma: revetment for lighter water-retaining structures, How the hybrid Prolock system works
View Sigma construction and sourceA Dutch water authority's maintenance register may identify responsible parties and maintenance duties within its area. Check the current register with the responsible authority and ask it for clarification if responsibility at your location is unclear. DamwandDirect cannot determine this location-specific responsibility.
Content reviewed on .
Verification sources: Registers and maintenance registers for water structures
Check the maintenance registerThere is no universal number of years. Assess current condition, cause and expected development of damage, and whether the structure still fulfils its function. The Dutch IPLO guide uses observation, diagnosis, prognosis and then a measure; replacing an entire revetment is an example of major maintenance. A stated system service life is therefore never the only decision rule.
Content reviewed on .
Verification sources: Inspection, maintenance and registers for water-retaining structures, Installing sheet piling
View the replacement and reuse checklistDamwandDirect lists 40 and 50 mm hardwood sheet piling, but thickness alone does not determine the suitable variant. Soil, water level, retained height, surcharge, embedment depth and any anchoring must be assessed together. Use the size as a product choice following project checks, not as an independent strength guarantee.
Content reviewed on .
Verification sources: Current range and product pages, Installing sheet piling
Compare construction methods and checksChoose by environment and exact application, not colour alone. PGB describes standard galvanising for dry, clean indoor environments and additional protection as exposure to moisture, salt or chemicals increases. Check the stated coating, material and permitted application for each item. Black colour or A2 stainless steel alone does not prove suitability for your waterfront; have the choice assessed for your project.
Content reviewed on .
Verification sources: Choose screws with the right coating, Current range and product pages
Check material and finish for each productRoute 1
Start with the plastic revetment guide if you want to protect a pond, ditch or lightly loaded waterfront. Then compare Prolock, hardwood post-and-panel construction and continuous hardwood sheet piling by complete construction rather than material alone.
Compare the three optionsRoute 2
First see which cost items make up a complete revetment. Then record route length, height, water level, indicative soil conditions, access, corners and photos. This makes quotes easier to compare and keeps unresolved checks visible.
View the cost breakdownResponsibility for the information
Stock, prices and available sizes can change and therefore belong on the current product page. We attribute statements on service life, circularity and product performance only to the source making them. For permits, we refer to the Dutch Omgevingsloket and competent authority because the outcome varies by location.
Verifiable sources
The links below support the factual information. Manufacturer sources remain clearly identified; check local rules with the competent authority. Linked external original sources are in Dutch and government sources concern the Netherlands.
Source for current sizes, price status, availability and ordering or quote route for each product variant.
Official manufacturer source for Prolock Sigma positioning, system construction and application context.
Dutch government explanation of possible permit, notification and other duties for sheet piling and revetment.
Technical Dutch government guide to inspecting, diagnosing, forecasting and condition-based maintenance of water-retaining structures.
Direct Dutch government explanation that the maintenance register identifies responsible parties and maintenance duties within the water authority area.
Official location-specific Dutch check for permits, notifications, information duties and applicable rules.
Official Dutch explanation of excavation notifications for machine excavation and the use of current cable and pipeline information.
Official Kadaster explanation that excavation depth does not determine whether a KLIC notification is compulsory for machine excavation.
Official manufacturer source on corrosion exposure and coating selection in dry, damp, salty or chemically exposed environments.
Source for current public transport terms and collection information.