Installing or replacing revetment: check permits and notifications

First record where and what you want to build. Then check the relevant rules and consent before ordering materials or committing to installation.

Short answer

There is no nationwide yes or no for every waterfront

According to the Dutch Informatiepunt Leefomgeving, several rules may apply simultaneously to sheet piling or revetment, including water authority and municipal rules. A general height or material type therefore does not provide a complete answer for your project.

Use the government explanation of sheet piling (Dutch) for background and the Dutch Vergunningcheck for your location.

Five steps before ordering

Make your plan checkable

  1. Record the location

    Record the address and draw the planned route on a site sketch. State whether the bank runs along a ditch, canal, pond or dike. Also record whose land the work will be on.

  2. Describe all the work

    Is this new construction or replacement? Record the existing and desired position, length and height. Also describe removal, excavation and changes to the bank. Take overview photos.

  3. Work through the Dutch Omgevingsloket

    Select the exact location and all activities in your plan. Also view ‘Regels op de kaart’. Keep the entered details and result so you and your contractor discuss the same plan.

  4. Discuss open questions

    Ask the competent authority for clarification if an activity is missing or an answer is unclear. Ask which details or drawings are still needed and which conditions affect position or installation.

  5. Include the conditions in the schedule

    Record who handles applications, notifications, landowner consent and work preparation. Align ordering and installation dates with the outcome. Also pass construction-related conditions to the person assessing the materials list.

Example

Replacing timber with plastic along the same line

You want to replace existing timber revetment with Prolock Sigma. Describe both the existing and desired situation. State whether posts will remain, the route will move or a terrace will be built behind the bank. Let the authority determine the rules and have the new construction assessed separately.

Prepare to replace your revetment

Keep one project overview

  • Site sketch and photos of the current bank
  • Description of the existing and desired situation
  • Check result and questions for the authority
  • Decisions, notifications and conditions received
  • Agreements on who handles each preparation task

The Vergunningcheck result depends on your answers. If in doubt, contact the authority assessing the rules for your plan.

Read the Omgevingsloket explanation (Dutch)

Frequently asked questions

Questions about permits and consent

Do I need a permit for revetment?

That depends on the location and work. Permits, notifications, information duties or general rules may apply. Check the complete plan in the Dutch Omgevingsloket and discuss uncertainties with the competent authority, often the municipality or water authority.

Is replacing revetment in the same place automatically permit-free?

Do not assume so. When replacing a structure, also describe removal of the existing construction, the new position and dimensions and any changes to the bank. Ask the competent authority to confirm which rules apply to this work.

Is landowner consent the same as a permit?

No. Work on someone else's land requires the owner's consent. Permits, notifications and other government rules may also apply. Check both before having the work carried out.

Does a KLIC notification replace a permit check?

No. The Dutch KLIC notification provides cable and pipeline information to prepare excavation. The permit check concerns the rules for your plan at that location. Machine excavation requires a prior KLIC notification; also check the other obligations.

Can DamwandDirect confirm that my revetment is permit-free?

A product choice or materials quote does not determine permit requirements. Have the rules for your location checked through the Dutch Omgevingsloket and competent authority. Include conditions that affect material selection in your enquiry.

From consent to a complete materials list

Also collect soil details, water level, retained height, load and access information. Suitable material selection needs these project details alongside the authority's conditions.

Verifiable sources

Sources for this page

The links below support the factual information. Manufacturer sources remain clearly identified; check local rules with the competent authority. Linked external original sources are in Dutch and government sources concern the Netherlands.