1. The whole route
Photograph the whole bank and draw straight sections, corners and ends. Measure lengths where safely accessible. Show connections to neighbouring properties, a jetty or other structures.
Record the condition of panels, posts and connections. Then have it determined which components can remain and which new construction suits your waterfront.
Prepare your project
This form collects observations for a discussion about repair or replacement. A tick only means you have considered the question. It is not a judgement of safety or the suitability of existing components. Do not loosen, uncover or add load to the bank to complete this form.
0/8 questions considered
Open the downloaded HTML file to print it or save it as a PDF using the print function. The download contains your entries and works offline.
Your entries stay only on this page in your browser. Nothing is saved or submitted. Download your result before leaving the page.
Short answer
A damaged panel may be a reason to also inspect posts, connections and the ground behind the bank. A new panel does not automatically solve a support problem. Record what you see; have the cause and required action assessed by an experienced contractor or structural engineer.
Profextru describes installation as work requiring skill and experience. For Sigma, post selection and any anchoring depend on the strength assessment.
View the manufacturer's system explanation (Dutch)Survey from a stable position
Take photos without dismantling the structure or adding load to the bank. Have the contractor survey hard-to-reach parts.
Photograph the whole bank and draw straight sections, corners and ends. Measure lengths where safely accessible. Show connections to neighbouring properties, a jetty or other structures.
Record leaning, deformation, open joints, damaged components and sinking ground. Note when you first noticed them and whether they are changing. Dated photos help discuss the progression.
Collect old drawings and information about posts, panels, walers, connections and anchors. Record what is visible and what remains unknown. Do not guess underground length from the top.
Describe water level, height difference and known soil conditions. Report a terrace, stored materials, traffic or other loading behind the bank. Also mention planned changes.
Show access routes and available working space on the sketch. Discuss how old material will be removed and disposed of and how new long components will reach the work area.
Check ownership, maintenance responsibility and applicable government rules. Record who handles preparation, assessment and installation.
Check permits and notificationsThree possible outcomes
Example
You want to replace timber panels with Prolock Sigma while keeping the posts. Include known post details and photos. First have it investigated whether the existing posts and connections suit the new construction. Then request the complete materials list, including finishing and fixings.
Profextru uses a completed cross-section for an indicative strength calculation. Information on the complete cross-section is therefore useful for replacement too.
Read how the manufacturer prepares a calculation (Dutch)From inspection to maintenance
The Dutch IPLO guide for water-retaining structures distinguishes observation, diagnosis, prognosis and selecting a measure. This is also a useful discussion sequence for your revetment: first record changes, then have their meaning assessed.
This sequence is not a maintenance instruction for every Prolock project. Match inspection timing and maintenance to the chosen construction, location and applicable rules. Also check maintenance responsibility with the Dutch water authority.
Frequently asked questions
That follows from the current condition and the cause and development of damage. If there is deformation, damaged components or sinking ground, have it assessed whether repair, partial replacement or new construction is needed. Age or a stated system service life alone is not enough.
First have the condition, dimensions, embedment depth and connections assessed for the new construction and load. The visible part of a post does not prove the whole post remains suitable. Include missing information as an open issue in the enquiry.
That is not a standard solution. Have available space, effects on the watercourse, connections, old construction and support assessed. Also check with the competent authority whether the changed position and construction are permitted.
Replacement also requires checking the rules for the location and work. Describe removal and installation together in the Dutch Omgevingsloket. Discuss doubts with the competent authority and check consent if working on someone else's land.
Send a site sketch, route lengths, overview and detail photos, known dimensions of the existing construction, water level, retained height, use behind the bank and access. State what is unknown and which rules or installation conditions have already been confirmed.
State which parts you want assessed or replaced. Ask separately about materials, removal, disposal, temporary provisions, transport and installation. Have it confirmed who handles the design and required consent.
Verifiable sources
The links below support the factual information. Manufacturer sources remain clearly identified; check local rules with the competent authority. Linked external original sources are in Dutch and government sources concern the Netherlands.
Official manufacturer source on skill, experience and points to consider when installing revetment.
Official manufacturer source for Prolock Sigma positioning, system construction and application context.
The manufacturer describes Prolock as a bespoke solution and requests a completed cross-section for an indicative strength calculation.
Technical Dutch government guide to inspecting, diagnosing, forecasting and condition-based maintenance of water-retaining structures.
Dutch government explanation of possible permit, notification and other duties for sheet piling and revetment.
Direct Dutch government explanation that the maintenance register identifies responsible parties and maintenance duties within the water authority area.