The need behind the project

The right edge
for this bank.

The situation

The timber between existing concrete posts had rotted. Water depth varies along the bank from approximately 1 to 1.5 m. The top edge is approximately 45 cm above water.

The material layout

The material schedule includes 68 Sigma panels of 2.50 m and 136 spruce posts of 6 m: two per panel. A waling and capping board finish the top.

How it comes together

A continuous black-brown bank edge with a broad timber top. The new components are illustrated; the existing concrete posts and anchors were not surveyed.

34 metrestotal bank length
2.50 metresfull panel height
Prolock Sigmasystem in this example
From the surface to the structure

The construction in 3D.
Take a closer look.

Rotate the model with your mouse or finger. Zoom into a detail or highlight a component to see how everything fits together.

3D construction34 metres · Prolock Sigma

Detail of the first 4 metres. One panel is omitted to reveal the posts. Open 3D to see the whole bank.

Example construction. Start the 3D view to rotate the whole bank yourself.

Drag to rotate · Zoom into details · Look below ground

The visual shows the new components in the quotation. Existing concrete posts and anchoring are not drawn; the actual connection to the existing structure cannot be established from the documents used.

01

Sigma panels

68 panels of 50 × 250 cm form 34 m of new wall.

02

Two posts per panel

136 round spruce posts, Ø 100 mm and 6 m long, according to the quotation.

03

Waling

34 m of 100 × 100 mm hardwood; calculated per metre at €18.12.

04

Timber top edge

34 m of 40 × 250 mm capping board, with screws in the material schedule.

05

Existing support

Reuse was the starting point. Positions and connections have not been reconstructed.

A clear view of costs

What do you need,
and what does it cost?

Quantities follow the project quotation. You can see unit prices at the stated date, required quantities and line totals. Selected stock lengths are listed for timber.

Indicative materials incl. VAT€11,340.88

Prices dated 13 November 2026
Transport and installation excluded

View all materials and dated prices
Material prices at the stated dateChecked on · including VAT.

Fasteners are calculated individually by dividing the box price by the number of pieces. Only the required quantity is included. Unit prices are carried through without intermediate rounding; line totals are rounded to cents.

MaterialEstimated quantityPrice per piece / unitLine total incl. VATNotes
Sigma panel · 0.5 m wide · 2.5 m long68 pieces€86.25per piece€5,865.00Price at stated datePrice for the stated size.
Unfinished milled post · Ø 100 mm · 6 m long136 pieces€29.60per piece€4,025.60Price at stated dateThis calculation uses 6 m posts. The project records also mention 6.5 m; the required post length must be determined for a new situation.
Hardwood capping board · 40 × 250 mm6 × 5 m + 1 × 4 m€96.75per piece of 5 m€77.40per piece of 4 m€657.90Price at stated dateExplicit purchase choice: 6 × 5 m + 1 × 4 m = 34 m; not a per-metre price. Joint/cutting plan and structural suitability not established.
Hardwood waling · 100 × 100 mm34 metres waling of 100 × 100 mm, calculated per metre€18.12per metre€616.08Price at stated datePer-metre price: €90.60 / 5 m = €18.12 per metre. €616.08 is included for 34 metres.
Flange-head screw 8.0 x 280 mm100 individual flange-head screws 8.0 x 280 mm€1.313per piece€131.30Price at stated date100 required pieces, calculated individually from 65.65 / 50. Dimensions and flange head match; coating/galvanisation and technical suitability still require confirmation.100 × Flange-head screw 8.0 x 280 mm at €1.313 per piece
Structural screw 8.0 x 80 mm150 individual structural screws 8.0 x 80 mm€0.30per piece€45.00Price at stated date150 screws, calculated individually from €15.00 / 50. A galvanised flange-head version was selected for this estimate.150 × Structural screw 8.0 x 80 mm at €0.30 per piece
Total materials incl. VAT€11,340.88Transport and installation separate
Also allow for

More than materials alone.

  • Transport and accessDistance, unloading space and room for equipment affect the work.
  • Installation and earthworksExcavation, installing posts, backfilling and reinstating the site.
  • The existing bankRemoval and disposal, or checking what can be reused.
  • Design and consentAssessment of soil and loading; any required calculation and consent.

No amount has been estimated here for these works. A total price for a new site follows from its own circumstances and quotation.

Useful to know beforehand

What needs attention
in this situation?

01

The calculation summary specifies 6.50 m posts; the quotation specifies 6 m. The actual installed length is unconfirmed, and the available records do not explain how this was resolved during installation. The estimate follows the 6 m quotation; the required length is determined again for a new project.

02

New anchoring components do not appear in this material list. The eventual reuse and connection to existing components have not been recorded, so the estimate does not include a complete new anchoring system. Reusing existing anchors is never automatic for a different bank.

03

Bed depth varies. The rendering shows simplified surroundings and is not a complete construction drawing.

04

68 panels of 50 cm together make 34 m; 136 posts is four posts per metre.

05

The capping board is selected as 6 × 5 m plus 1 × 4 m for the estimate. The 100 × 100 mm waling is calculated per metre: €90.60 / 5 m = €18.12 per metre; 34 m costs €616.08.

Further reading: Prolock Sigma · Revetment and costs · Installation advice · Permits and consent

Your bank, your situation

What suits
your waterfront?

An approximate length, a photograph and a short description are a good start. We can then discuss materials, access and costs together.

Discuss your project
More inspiration

A different bank.
A different construction.